Current directory: /home3/bjinbymy/public_html/indianext/wp-content/mu-plugins NTPC Invites Bids To Set Up 3GW Energy Storage Facility In India - Energy Storage
Indianext
No Result
View All Result
Subscribe
  • News
    • Project Watch
    • Policy
  • AI Next
  • People
    • Interviews
    • Profiles
  • Companies
  • Make In India
    • Solutions
    • State News
  • About Us
    • Editors Corner
    • Mission
    • Contact Us
    • Work Culture
  • Events
  • Guest post
  • News
    • Project Watch
    • Policy
  • AI Next
  • People
    • Interviews
    • Profiles
  • Companies
  • Make In India
    • Solutions
    • State News
  • About Us
    • Editors Corner
    • Mission
    • Contact Us
    • Work Culture
  • Events
  • Guest post
No Result
View All Result
Latest News on AI, Healthcare & Energy updates in India
No Result
View All Result
Home Energynext Energy Storage

NTPC Invites Bids To Set Up 3GW Energy Storage Facility In India

January 28, 2022
ntpc

State-run power giant NTPC’s arm, NTPC Renewable Energy Ltd (NREL), has invited bids for selection of developers for inter-state transmission system (ISTS)-connected energy storage facility of 3,000 MW capacity at any location in India to meet round-the-clock requirement of renewable energy.

NTPC Renewable Energy intends to avail energy storage facility to meet its round-the-clock renewable energy requirement with a wind/solar generation profile under service model through an ISTS-connected energy storage solutions with capacity of 3000 MWh with 500 MW (minimum) at any location in India, as per the bid document.

As per the document, the capacity shall be installed under a Capex mode through Global Competitive Bidding Process (conducted online followed by reverse auction).

After the conclusion of the bidding process, NREL shall enter into an energy storage service agreement on an annual fixed charge basis with the selected bidders for a period of 25 years.

The power generated by any of the RE projects of NTPC/NREL shall be used for the charging of the Energy Storage Service (ESS) project and NREL shall utilize this energy storage facility, on an “On-Demand” basis, suited to its requirements during the peak and off-peak hours to meets its round-the-clock requirement of renewable energy.

The project size will be of minimum 600 MWhr with 100 MW (min) capacity.

The bidders can quote capacities in different combinations like manner 600 MWh with 100 MW (min) capacity or 1200 MWh with 200 MW (min) capacity or 1800 MWh with 300 MW (min) capacity or 2400 MWh with 400 MW (min) capacity or 3000 MWh with 500 MW (min) capacity.

Already commissioned projects cannot be considered under this RfS (request for selection).

The projects under construction or projects which are not yet commissioned will, however, be considered in case these projects are not already accepted under any other Central or State Schemes, as per the bid document.

Enhancement and augmentation of already commissioned projects, irrespective of their capacities, will not be considered as eligible projects under this scheme, it said.

Further, the total completion schedule of the assignment has been kept as 24 months from the date of signing of the Energy Storage Service (ESS) Agreement.The ESS Agreement shall be signed within three months from the issuance of Letter of Award, it added.

Source: moneycontrol.com

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Editors Corner

How can Artificial Intelligence tools be a blessing for recruiters?

Will Artificial Intelligence ever match human intelligence?

Artificial Intelligence: Features of peer-to-peer networking

What not to share or ask on Chatgpt?

How can Machine Learning help in detecting and eliminating poverty?

How can Artificial Intelligence help in treating Autism?

Speech Recognition and its Wonders in your corporate life

Most groundbreaking Artificial Intelligence-based gadgets to vouch for in 2023

Recommended News

AI Next

Google: AI From All Perspectives

Alphabet subsidiary Google may have been slower than OpenAI to make its AI capabilities publicly available in the past, but...

by India Next
May 31, 2024
AI Next

US And UK Doctors Think Pfizer Is Setting The Standard For AI And Machine Learning In Drug Discovery

New research from Bryter, which involved over 200 doctors from the US and the UK, including neurologists, hematologists, and oncologists,...

by India Next
May 31, 2024
Solutions

An Agreement Is Signed By MEA, MeitY, And CSC To Offer E-Migration Services Via Shared Service Centers

Three government agencies joined forces to form a synergy in order to deliver eMigrate services through Common Services Centers (CSCs)...

by India Next
May 31, 2024
AI Next

PR Handbook For AI Startups: How To Avoid Traps And Succeed In A Crowded Field

The advent of artificial intelligence has significantly changed the landscape of entrepreneurship. The figures say it all. Global AI startups...

by India Next
May 31, 2024

Related Posts

Energy-storage-is-key-to-unlocking-renewable-power-s-full-potential
Energy Storage

Energy Storage Is Key To Unlocking Renewable Power’s Full Potential

July 22, 2022
EV
Energy Storage

Mahindra Open To Investing In EV Battery Cell Maker To Secure Supplies – CEO

July 11, 2022
Lithium-Ion-Battery
Energy Storage

Sion Power’s Lithium Metal Battery Technology Assessed by Leading Independent Industry Expert

June 15, 2022
coal
Energy Storage

India Heading Towards Another Power Crisis In July-August: Report

May 30, 2022
Load More
Next Post
solar-Energy

India's Renewable Energy Sector Can Employ 1 Million People By 2030: Study

IndiaNext Logo
IndiaNext Brings you latest news on artificial intelligence, Healthcare & Energy sector from all top sources in India and across the world.

Recent Posts

Google: AI From All Perspectives

US And UK Doctors Think Pfizer Is Setting The Standard For AI And Machine Learning In Drug Discovery

An Agreement Is Signed By MEA, MeitY, And CSC To Offer E-Migration Services Via Shared Service Centers

PR Handbook For AI Startups: How To Avoid Traps And Succeed In A Crowded Field

OpenAI Creates An AI Safety Committee Following Significant Departures

Tags

  • AI
  • EV
  • Mental WellBeing
  • Clean Energy
  • TeleMedicine
  • Healthcare
  • Electric Vehicles
  • Artificial Intelligence
  • Chatbots
  • Data Science
  • Electric Vehicles
  • Energy Storage
  • Machine Learning
  • Renewable Energy
  • Green Energy
  • Solar Energy
  • Solar Power

Follow us

  • Facebook
  • Linkedin
  • Twitter
© India Next. All Rights Reserved.     |     Privacy Policy      |      Web Design & Digital Marketing by Heeren Tanna
No Result
View All Result
  • About Us
  • Activate
  • Activity
  • Advisory Council
  • Archive
  • Career Page
  • Companies
  • Contact Us
  • cryptodemo
  • Energy next
  • Energy Next Archive
  • Home
  • Interviews
  • Make in India
  • Market
  • Members
  • Mission
  • News
  • News Update
  • People
  • Policy
  • Privacy Policy
  • Register
  • Reports
  • Subscription Page
  • Technology
  • Top 10
  • Videos
  • White Papers
  • Work Culture
  • Write For Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

IndiaNext Logo

Join Our Newsletter

Get daily access to news updates

no spam, we hate it more than you!